project list


Wrentham Elementary School Addition and Wastewater Treatment Plant
Wrentham, MA  2001 to 2003
Project manager for $8 million addition featuring 16 classrooms, offices and a gymnasium, together with a DEP-mandated treatment plant.
     
King Philip Middle School Additions and Renovations
Norfolk, MA  2001 to 2003
Project manager (to the start of contract administration) for $26 million renovations and additions to a 976 student middle school.
     
Hanover School District Feasibility Study
Hanover, MA  2002
Project manager for district-wide study of school building needs, including enrollment projections, comprehensive facilities' evaluation, development of educational specifications and building options.
     
TEXAS WILD!
Fort Worth Zoo
Fort Worth, Texas  1998 to 2001
Project manager for $45 million addition featuring over 80 species of Texas wildlife in a highly educational and intensely entertaining setting.
(More information through the Portfolio page.)
     
Redevelopment Projects for Near South Side
Fort Worth, Texas  1996 to 1998
The near southside of Fort Worth is a large, older section of the city poised for revitalization. BASS/HUCABY ARCHITECTS provided planning and architectural services to area planners and developers, implementing adaptive reuse, new urbanism and sustainable architecture concepts. Sample projects include:
  ArtSpace Texas - Renovation of a 1909, 5-story, Gothic brick building for an artist coop, including apartments, artists' studios and community facilities.
  Modern Drug Redevelopment - planned, mixed-use development involving 15,000 sf of historic adaptive reuse and 40,000 sf of new construction.
  Old Fire Station No 5 - adaptive reuse of a turn-of-the-century building for an audio-visual studio.
  Newkirk-Wallerick Building - adaptive reuse of a 1920's structure for offices.
  New Commercial Building - speculative office building.
     
Additions and Alterations for the Offices of Marketing Management Inc
Fort Worth, Texas  1994
Design and Construction documentation for a two -story addition and renovated entry of an office building.
     
Branch Bank Facilities for Bank One
North Texas  1993 to 1995
Adaptation of branch bank design for five sites.
     
Yard Office for the Santa Fe Railroad Intermodal Facility, Alliance
Fort Worth, Texas  1993
Construction documentation for the administration building and railhead tower facility.
     
Administration Building for the Alabama-Coushata Indian Reservation
Livingston, Texas  1991/1992
Designer and project architect for a 20,000sf/$2 million facility. The design incorporates motifs of the Indian culture in a forest setting.
(View project)
     
Additions to Hardin County Jail
Kountz, Texas  1992
Construction documentation for a 144 bed addition to an existing jail.
     
The Howard Centre Shopping Mall
Welwyn Garden City, England  1989/1990
Programming, design, construction documentation specification, tendering and construction supervision of a works package (on a management contract) for a large, complex shopping mall/rail station.
     
Central Public Library Expansion
Fort Worth, Texas  1988
Design development and construction documentation. This project includes additions to an existing underground library of two levels of a new library and archival space at levels 5 and 6, multi- level parking for 200 cars, and a community television studio at grade. Levels 5 and 6 span the existing structure to allow future levels 2, 3 and 4 to be inserted inbetween. $10.5 million budget.
     
Visitors Conference Center
Southwester Baptist Theological Seminary

Fort Worth, Texas  1987
Programming, schematic design and presentation drawings for a conference and guest rooms facility. 65,000sf/$6.5 million.
     
Cowden Music Hall Additions
Southwester Baptist Theological Seminary

Fort Worth, Texas  1987
Programming, schematic design and presentation drawings for an addition to an existing building comprising a music library, recital hall and practice rooms. 20,000sf/$6.5 million.
(View project)
     
Truett Auditorium
Southwester Baptist Theological Seminary

Fort Worth, Texas  1987
Feasibility study and cost estimate for vertical and horizontal expansion of existing stage facilities.
     
Moody and Carrol Libraries
Baylor University

Waco, Texas  1987
Analysis and long-range planning of library and special collection facilities; historic structure adaptive-reuse study.
     
Clifton Lutheran Sunset Home
Clifton, Texas  1986
Construction documentation for a 52 bed nursing home.
     
Gift House for Japanese Gardens
Fort Worth Botanical Gardens

Fort Worth Texas  1985
Construction documents and construction observation on a Japanese-styled, wood structure.



return to home page